House extensions & structural alterations
Single and two-storey extensions, wall removals, steel beams and party wall work. We take the job from setting out and the first dig right through to a snagged handover.
An extension is really three jobs stacked on top of each other: a groundworks job, a structural job and a fit-out job. Most of the problems homeowners run into come from those three being done by three different outfits who blame each other when something doesn't line up. We do all three.
What we build
- Single-storey rear and side extensions, including wraparounds
- Two-storey side and rear extensions
- Wall removals and open-plan alterations with structural steel
- Party wall work on semi-detached and terraced houses
- Garage conversions and infills
- Full house renovations where the extension is part of a wider job
How the job runs
Every extension follows roughly the same sequence. Knowing it helps you understand where your money goes and why the middle of the job looks slower than the start.
| Stage | What happens |
|---|---|
| Set out & dig | Levels taken off a fixed datum, foundations set out, topsoil stripped and trenches excavated |
| Foundations | Concrete poured to engineer's detail, rising walls built up to DPC |
| Floor slab | Hardcore compacted in layers, radon barrier, insulation, mesh and slab |
| Superstructure | Blockwork, cavity insulation, structural steel set and padstones bedded |
| Roof & watertight | Roof structure, felt and slate or flat roof build-up, windows and doors in |
| First fix | Plumbing, electrics and any mechanical services chased and run |
| Plaster | Internal skim and external render, then drying-out time |
| Second fix & snag | Finishes, sanitaryware, sockets and switches, then snag list closed out |
What actually drives the cost
Two extensions of the same floor area can be twenty per cent apart in price. These are usually the reasons:
- Ground conditions. Made ground, a high water table or a nearby tree can push foundations well below the usual depth. This is the single biggest unknown before we open the ground.
- Structural steel. Long spans, party wall beams and anything needing temporary propping add cost quickly — both in the steel itself and in the labour to get it in.
- Glazing. Large sliding or lift-and-slide doors and rooflights are often the biggest single line in the quote after the shell.
- Level of finish. Builder's finish versus turnkey can be a third of the total.
- Access. A rear garden with no side passage means everything comes through the house or over a wall, and spoil goes out the same way.
Builder’s finish or turnkey
Builder's finish means the house is structurally complete, watertight, plastered, first and second fixed, with a functioning bathroom and heating. You bring your own kitchen, flooring, tiling, painting and wardrobes. Most clients working to a budget take this route because it lets them spend on finishes at their own pace.
Turnkey means you get the keys and move in. We manage the finishing trades and the whole thing lands as one contract with one point of responsibility.
Working with your architect or engineer
We're comfortable pricing off a full set of drawings and a structural engineer's details, and equally comfortable pricing off a sketch and a conversation. If you have planning granted and a tender package, send it and we'll come back with a measured quote. If you're at the idea stage, we can give you a realistic range early so you know whether to keep going.
On larger jobs we recommend a written contract with a stage payment schedule, a defined programme and a retention held until snags are closed. That protects you as much as us.
Common questions
Do I need planning permission for an extension?
Ireland's exempted development rules allow certain rear extensions to houses without planning permission, subject to strict conditions on floor area, remaining private open space, height and previous extensions to the property. Side and front extensions, and anything above ground floor level, are treated differently again. The rules are easy to fall foul of, so always confirm your specific case with the planning section of your local authority or with your architect before committing.
How long does an extension take?
A straightforward single-storey rear extension typically runs twelve to eighteen weeks on site. A two-storey extension is usually eighteen to twenty-six weeks. Weather, drying-out time after plastering and lead times on windows and steel are the usual causes of delay, and we build realistic allowances for those into the programme rather than quoting a best case.
What is a PC or provisional sum?
It's an allowance for work or materials that can't be priced accurately at quote stage, such as a kitchen, tiling or an electrical fit-out where the spec isn't fixed yet. We show these separately in the quote so you can see exactly which parts of the price are fixed and which will be adjusted once the actual spec is chosen.
Do you take stage payments?
Yes. Payments are tied to work actually completed on site, set out in a written schedule agreed before we start, usually with a mobilisation payment at the beginning and a retention held until the snag list is closed out.
Do you work off an architect's drawings?
Yes, and it usually produces a more accurate price. Send the plans, elevations, sections and any structural engineer's details, and we'll measure and price from them.